Wet Utility Emergency Repair

Project Owner: City of Mesa
Project Type: Job Order Contracting
Construction Dates: 03/23 to 03/25

This job order contract is for emergency repair services for wet utilities throughout the City of Mesa. This job order contract is for emergency repair services for water, sewer, and irrigation lines throughout the City of Mesa. To date, we have completed four repairs, including: 

  • Carbon unit installation at the Lehi Lift Station.

  • Assessment and removal of a 24” water valve and installation of five feet of 24" diameter water line.

  • Repair of eight inches of concrete cylinder pipe, removal of the old mortar coating, and restoration of the mortar lining.

  • Repair of a water main break at Gilbert Road and Southern Avenue.