Sanitary Sewer Rehabilitation
Project Owner: Town of Fountain Hills
Delivery Method: Design-Bid-Build
Construction Dates: 07/16 to 08/16
This project included the rehabilitation of 1,994 LF of 18” and 825 LF of 8” sanitary sewer pipe using UV CIPP. The sewer line was located in an alley and through several primitive desert areas behind affluent neighborhoods. Achen-Gardner worked closely with area residents to coordinate access.